Optimizers·SONATA

Multi-port stowage planning

4 hrs → 30 min

Planners get 2–4 hours per port to allocate cargo manually — and almost no time left to optimise. SONATA produces the plan in under 30 minutes, so the time goes back into refinement.

Anonymised customer profile

Industry

Feeder Operator

Region

Asia-Pacific

Fleet / scale

Hub-and-spoke network · 30+ ports

01

The challenge

Vessel planners get the cargo list 24 hours before arrival and owe the terminal a plan 8 hours before operations. That leaves 2 to 4 hours of manual allocation — and almost no time left to optimise.

  • Allocating containers into charted bays manually, then re-adjusting for reefers, DG cargo and special containers, consumed the entire planning window.
  • Three-port rotations required balancing cargo weight, stability, lashing limits and port sequence by hand.
  • Plans that looked optimal on paper degraded in practice when real cargo deviated from forecast — and there was no time to re-plan.
02

The approach

Replaced manual planning with SONATA's optimisation engine — predictive analytics, ML, and high-level algorithms producing a complete plan in under 30 minutes.

  • Generates the full stowage plan in under 30 minutes, so the 2–4 hours go back into refinement and stress-testing.
  • Real-time stability, strength and lashing calculations baked into the planning logic.
  • Automated IMDG dangerous-cargo segregation as a hard constraint.
  • Multi-port planning and round-voyage analysis on one model — no opaque manual iterations.
Products usedSONATA
03

The results

2–4 hrs → 30 min

Time to a complete stowage plan

IMDG hard

Dangerous-cargo segregation enforced automatically

Multi-port

Round-voyage analysis on one model

Lower

Operating costs · port dwell time · restow

Deployment

Live in 8 weeks

ROI

Operational from day one

Talk to us about a similar deployment.

We'll map your workflow, share what we've learned from similar engagements, and tell you honestly where the gains sit.

Book a 30-min conversation